Q&A for RFP

In our recent RFP document, we commit to posting questions and answers raised during the info session. Here are all the questions raised to date, and our answers.

Q: How high will the ceilings be in the Hub’s studio spaces?

A: The approximate ceiling height from the top of the finished floor in the studio spaces is 4.75m (15 feet and 7 inches). Because the ceilings in the studio spaces are open, this estimated height does not take into account any servicing (ducts, lighting, etc.), so practical height will be somewhat lower. 

Q: Is there additional storage available for occupants of the studios?

A: To ensure flexibility of use, storage has not been built into the studio spaces, and the studios do not include dedicated storage space elsewhere in the Hub. When thinking about the area of the studio spaces, also consider how to accommodate storage needs within that area. 

Q: Does the Hub have parking?

A: While the Hub does not have its own dedicated parking, there will be ample parking available with easy access to the facility. The Hub is located immediately beneath the parking decks of a large parking garage at 33 King Street, and those parking levels will be directly connected by an elevator that will exit on to the outdoor public space next to the Hub’s entrance. There will also be a new 70-space TPA lot built next to the project site. Finally, the Hub itself will have a loading entrance, accessible from the driveway between the Hub and the railway corridor. 

Q: When might the studio spaces be delivered for fit-out?

A: Construction is proceeding on schedule, and spaces may be available for delivery to occupants as early as July 2018, but an exact date cannot yet be provided. The studio spaces will be delivered as open, flexible spaces, in a state that is suitable for occupation (flooring, lights, sprinklers, ductwork installed). If the occupant wishes to further sub-divide or fit-out the space, it will be at their own cost. Depending on timing, additional fit-out may be undertaken under Artscape’s building permit, or following completed of work on the Hub, under a new permit obtained by the occupant.

Q: Will the Artscape Hub be accessible?

A: Yes, the Artscape Hub at Weston Common will be fully accessible by Ontario standards.